Industrial
Archaeology
| Follows the main stages of work on the 1989 Dudley Tunnel, from January to September '89 during the construction of this new canal tunnel, between Castle Mill Basin and Little Tess Cavern, and the work on the Rock Tunnel between there and Singer Cavern. | ![]() |
![]() |
Underground engineering techniques, including rock drilling for roof bolts,
shot-creting and blasting the heading are seen in detail. The new excavation
allows trip boats to make a 'round trip' through the cavernous limestone mines
and the ancient and modern tunnels.
NGR (139) SO 945 916 Recorded 1989 This tape has no commentary. Running Time: 59 mins. £ 11.75 Also available as part of a longer collection; see Compilation No. 15: "Dudley Tunnel 1988 to 1989" |