Engine Logo
I.A.Recordings
Industrial Archaeology


Compilation 14: Construction of the 1989 Dudley Tunnel
Inland waterway video


Follows the main stages of work on the 1989 Dudley Tunnel, from January to September '89 during the construction of this new canal tunnel, between Castle Mill Basin and Little Tess Cavern, and the work on the Rock Tunnel between there and Singer Cavern. The New and the Old
Climbing into Quarry Pit shaft Underground engineering techniques, including rock drilling for roof bolts, shot-creting and blasting the heading are seen in detail. The new excavation allows trip boats to make a 'round trip' through the cavernous limestone mines and the ancient and modern tunnels.

NGR (139) SO 945 916
Recorded 1989

This tape has no commentary. Running Time: 59 mins. £ 11.75

Also available as part of a longer collection; see Compilation No. 15: "Dudley Tunnel 1988 to 1989"

All images taken from the video.

Back toLogoI.A.Recordings Home Page CompilationsCompilations list


Last modified 24/03/01 Categories: Mining history video, mining video, canal history video, inland waterway history video, canal video, inland waterway video